● Executive Process Infographic Microsoft Dynamics 365 Business Central
BDM GLOBAL • DYNAMICS 365 BC ARCHITECTURE

Subcontracting & Custom Tanning Process Flow

Complete operational & cost accounting roadmap: converting Raw Hides to Pickled/Tanned Hides, tracking yield loss, and capitalizing freight and tolling fees into final inventory value.

Core Strategy
Full Cost Roll-Up
Raw + Freight + Tolling ÷ Yield
Business Central Subcontracting Workflow Diagram

Visual Architectural Map: 6-Stage Dynamics 365 Business Central Subcontracting & Landed Cost Capitalization Flow

Strategic Decision Rationale

Simple Location Transfer (Why It Fails)
  • No SKU Transformation: Item A leaves as Raw Hides and can only be received back as Item A. Cannot create Item B (Tanned Hides).
  • No Scrap/Yield Loss Handling: Sending 1,000 pcs and getting back 998 pcs causes unexplained inventory variances or phantom shortages.
  • Uncapitalized Toll Fees: TDR’s service invoice hits P&L expense directly instead of rolling into finished inventory asset value.
BC Subcontracting & Production (The Recommended Solution)
  • Full Bill of Materials (BOM): Item A is consumed, Item B is manufactured with exact routing and audit trails.
  • Yield Variance Absorption: The 2-piece scrap loss is mathematically absorbed into the unit cost of the 998 saleable pieces.
  • 100% Landed Cost Capitalization: Freight + Subcontracting purchase invoice flow directly into finished goods inventory value.

Step-by-Step Execution Workflow

Full audit compliance • GAAP / ASPE 3031
STAGE 01 Setup

Locations & Master Data

Establish separate legal & physical entities in Business Central.

Rename Location: CANLT → BDM-Nicolet
New Subcon Location: TDR-SUBCON
Subcon Work Center: WC-TANNING (TDR)
Key Benefit: Raw hides physically at TDR remain on BDM's balance sheet under TDR-SUBCON.
STAGE 02 Logistics

Material Dispatch & Freight

Move Raw Hides to tannery and attach transportation costs.

BC Document: Transfer Order
Physical Movement: BDM-Nicolet → TDR
Outbound Freight: Item Charge (Assigned)
Cost Rule: Carrier freight bill is assigned via Item Charge directly to Raw Hides in transit.
STAGE 03 Subcontracting

Production Order & PO

Trigger manufacturing order and automate TDR service PO.

Production Order: For Item B (Tanned)
BC Automation: Subcon Worksheet
Vendor PO Created: Custom Tanning Fee to TDR
Automation: BC calculates required tolling units and generates a Purchase Order linked to the job.
STAGE 04 Processing

Consumption & Yield Loss

Record chemical processing and account for process scrap.

Raw Input (Item A): 1,000 pieces consumed
Finished (Item B): 998 pieces output
Yield Loss (Scrap): 2 pieces recorded
Yield Rule: 100% of the cost of the 2 scrapped hides is absorbed by the 998 good pieces.
STAGE 05 Invoicing

Subcontractor PO Receipt

Match TDR tolling invoice to WIP production order.

PO Receipt Posting: Capacity Entry to WIP
Subcon Invoice: Matched to PO Receipt
Third-Party Ready: Works for TDR or any tannery
G/L Synchronization: Processing cost moves from AP subledger directly into Production WIP.
STAGE 06 Completion

Return & Landed Cost Final

Receive finished hides back at Nicolet with 100% capitalized cost.

Final Location: BDM-Nicolet
Inventory Status: 998 pcs of Item B
BC Routine: Adjust Cost - Item Entries
Outcome: Exact valuation per finished piece in Item Ledger & Balance Sheet.
Unit Cost Accounting Formula in Business Central

How Business Central Dynamically Calculates Item B Valuation

Raw Hides (1,000 pcs @ Cost)
+
Outbound & Inbound Freight
+
TDR Tanning Service Fee
998 Good Finished Pieces (Yield Loss of 2 pcs absorbed)
= 100% True Landed Unit Cost of Tanned Hides (Item B) recorded in Balance Sheet Account 23625 (Finished Goods).

Next Action Steps for Shobhit & Benjamin

1. Rename Existing Location

Update location code CANLT to BDM-Nicolet in BC Location Card.

2. Create Tannery Location

Create new location TDR-SUBCON with TDR address for subcontractor inventory tracking.

3. Process the 9 Pallets

Create the BOM for Item B, issue Transfer Order to TDR-SUBCON, and launch the Subcontracting Production Order.